Today I went into the shed to take some measurements for the dust extraction ducting. The inside and outside of the Shed is now very impressive... Here are a few pictures to give you an idea of how the Shed is coming on.
Thank you to all the members that have forwarded photos to post of the Green Head visit. As there are so many - I have made a link to to a photo album. Just open the post and click on the picture below and it should take you to a Google Album ( I think you need to be a Google account holder... )
The Shed construction is progressing well, ground work is complete, the foundations and slab have been poured. Attached is a link to a fly-over video that was taken before the slab was poured. https://drive.google.com/file/d/18KRSrjPGRj-ZtKLf76nd4_WbRTRLQDjX/view?usp=drivesdk